Home

Firewall Forward
 
10/13/2006 Received Firewall Forward Kit 0.5 11/19/2006 Installed throttle/mixture mount. 2.0
11/21/2006 Received engine. Installed elec fuel pump outlet tubing and fitting 2.0 11/23/2006 Positioned engine for hoisting 1.0
11/24/2006 Mounted engine to airframe. 3.0 1/21/2007 Hung the exhaust system 0.5
1/24/2007 Torqued exhaust bolts. 0.5 2/2/2007 Looking for missing stuff to order. 0.5
2/3/2007 Temporary hookups to look for fit issues 0.5 2/6/2007 Discovered that I have wrong fuel injector servo 0.5
2/9/2007 Installed replacement servo 0.5 2/15/2007 Installed alternator 2.5
2/16/2007 Thinking 0.5 2/17/2007 Hooked up hoses, fittings and mounted sensors. 4.0
2/18/2007 Cut hole in f/w for heater. Attached push/pull cables 1.5 2/19/2007 Installed alternator belt cut hole in ldg gear box for control cables. 3.5
2/21/2007 Installed remaining CHT, EGT and oil press sensors. 2.5 3/10/2007 Fitted left cylinder baffles 2.0
3/11/2007 Fabricated angle, spacer and fitted around #4 cylinder 3.0 3/12/2007 Fitted right rear and right cylinder baffles 3.0
3/13/2007 Fitted left front floor baffle. 2.5 3/14/2007 Started on left front baffle 2.0
3/15/2007 Fitted left front baffle 3.0 3/17/2007 Fitted left front baffle. Fabricated parts. Riveted front baffles. 8.5
3/18/2007 Installed oil cooler 3.5 3/20/2007 Attached seal to left rear baffle 1.0
3/21/2007 Attached seal to right rear baffle 1.0 3/23/2007 Attached rear to right side 1.0
3/24/2007 Attached seal to right front 1.5 3/25/2007 Finished attaching baffle seal. Attached hoses to oil cooler. Hooked up alternator. 4.0
3/26/2007 Started installing exhasut supports 1.5 3/27/2007 Finished installing exhaust supports. Assembled heat muf 2.5
3/28/2007 Finished w/ heat muf 1.0 3/29/2007 Expanded hole for throttle/mixture cables in landing gear box. 2.5
3/31/2007 Installed throttle eyeball seat. 2.0 4/1/2007 Finished "eyeball" seals for throttle/micture cables. Installed alt air cable, breather tube, fuel pump overflow, map sensor and prop bolts. 8.0
4/2/2007 Installed ignition wire seals for right rear baffle. 2.0 4/3/2007 Re-enforced wire attach points on left baffles. Installed ignition wire seals. 3.5
4/6/2007 Cut front of air box. Drilled top plates together 2.5 4/7/2007 Cut air box to fit to cowl. Drilled air box. Fiberglassed over cut. 3.5
4/8/2007 Trimmed away at spinner. Drilled to spinner plates. 3.0 4/9/2007 Finished air filter assembly - except fiberglass arounbd lower cowl. 3.0
4/10/2007 Fiberglassed between the cowl snout and air filter box. 2.5      
           

Home

email: Luis Luciani