11/09/2005
Next | Prev | Index | Home

The fuselage kit came in today so I didn't get a whole lot done with the tank. I took half a day off from work but spent it all opening boxes, unwrapping and inventorying.

On the tank, I didn't leave myself with much time (or energy) to ProSeal. So I drilled the holes for the BNC connector and vent line in the inside rib. I also cut and soldered the wires from the BNC connector and the outside sender plate.

The pitot tube from Dynon came in. It looks too cool with the Gretz mount. My order for the missing screw replacement came in as well.

email: Luis Luciani  Next | Prev | Index | Home