Home

Right Tank
 
8/2/2005 Worked on Z brackets 3.5   8/3/2005 Finished mounting z-brackets on spar. Clecod tank together & mounted on spar. 2.5
8/5/2005 Finished drilling z-brackets 2.0   8/6/2005 Match drilled rib and rear baffle holes. Made stiffeners. 4.1
8/7/2005 Match drilled stiffeners, screw holes, countersunk and fabricated tank attach plate. 2.5   8/8/2005 Fabricated tank attach plate for the right tank. 1.5
8/9/2005 Drilled holes and attached outboard capacitive fuel level plate. 1.0   8/10/2005 Drilled holes and attached outboard capacitive fuel level plate. 1.2
8/11/2005 Cut access hole in inside rib 1.0   8/13/2005 Finished access cover, drilled fuel cap flange. 4.5
8/14/2005 Deburred and dimpled skin.holes. 3.5   8/15/2005 Prosealed stiffeners 2.0
8/19/2005 Deburred ribs 2.5   8/20/2005 ProSealed and riveted tank filler, drain and 3 ribs 6.0
8/21/2005 ProSealed and riveted remaining inside ribs and outermost rib. Installed vent line. 3.5   8/23/2005 Crimped terminals. Installed wiring. 1.0
8/24/2005 Installed fuel pickup. More ProSeal 2.5   8/25/2005 Deburred rear baffle 1.5
8/26/2005 Installed rear baffle 4.0   12/22/2006 SB from Vans on fuel pickup tube 1.0

 

     

 

   

Home

email: Luis Luciani